Indonesia Mining Due Diligence Checklist: How to Verify an IUP Holder Before You Invest

Oleh Teramine EditorialDiterbitkan 21 November 202610 menit bacaPerusahaan: Kementerian ESDM; Ditjen Minerba; BPK

A step-by-step checklist for verifying an Indonesian mining company before money moves: the permit record in MinerbaOne, the annual RKAB and what it requires, overlap risk under Law 2/2025, reclamation guarantees, forest-area and environmental consistency, state payments, and ministerial approval of any share transfer. Each step is tied to the regulation that makes it matter.

A data room usually contains a scanned permit, a resource estimate and a production chart. None of these proves the asset is sound. In Indonesia the mining right sits in a permit (IUP or IUPK) that the state can suspend, cut back or revoke, and in 2025–2026 the rules for checking that permit changed. This checklist sets out what to verify and which regulation makes each item important, so a foreign investor knows what to ask an Indonesian adviser for.

It deals with verification. For deal structure (take over, joint operation, joint venture), see [how to buy a mine in Indonesia](/en/news/how-to-buy-a-mine-in-indonesia).

The checklist at a glance

#CheckWhat to obtainWhy it matters (rule)
1Permit recordPermit number, holder, commodity, stage, area, term, checked against the ministry systemLicensing data now runs through MinerbaOne
2OverlapPermit-area coordinates compared with neighbouring permitsLaw 2/2025, Art. 171B: overlapping pre-2025 IUPs are revoked
3Annual RKABApproved RKAB for the current year and the next onePermen ESDM 17/2025: one-year RKAB; no RKAB, no legal production
4RKAB inputsProof of PNBP payment, reclamation guarantee, competent-person resource report, mine-manager appointmentPermen 17/2025, Art. 5 lists these as conditions of approval
5Production vs planActual output compared with the approved RKAB, FS and environmental approvalArt. 5(1)(b)(7)–(8) and Art. 17
6Forest and environmentForest-use approval map, environmental approvalArt. 5(1)(b)(4)(d); RKAB approval letter template
7Reporting and sanctionsQuarterly reports and any warning lettersArts. 19 and 25–30
8Share historyMinisterial approval for every past share transfer; approval of yours as a closing conditionLaw 3/2020 Art. 93A; PP 96/2021 Art. 72

1. Verify the permit at the source, in the current system

Start with the official record, not the copy. Indonesia's mining data was historically held in MODI (Minerba One Data Indonesia), with MOMI (Minerba One Map Indonesia) as the map layer used to detect overlapping areas. According to a January 2026 analysis by SNP Lawyers, the ministry has since consolidated these into a single MinerbaOne platform: data previously held in MODI has been migrated, IUP registration and amendments now go through MinerbaOne, and the older Clean and Clear (CnC) verification and Reconciliation Minutes are, in that firm's reading, no longer the operative test.

This matters for buyers because a seller's "CnC certificate" was for years the standard comfort document. It is now history. It shows the permit passed a past review. It does not show the permit's current status. Ask your adviser to confirm, in the current system, the permit number, holder name, commodity, stage (exploration or production operation), area and expiry.

Why bother when a registry entry exists? Because the registry has been wrong before. In its first-semester 2024 audit summary, the state audit agency BPK found 61 metal-mineral IUPs registered in MODI with incomplete licensing requirements (administrative, area, technical, financial and environmental), and 27 IUPs whose supporting documents were unclear or absent from regional-government records. It recommended that the ministry complete the files, reconcile the 27 with regional governments, and take enforcement action where needed. The ministry's minerals directorate said its process had been carried out according to the rules. So a registry entry is where your checks begin. It does not settle them.

If the permit categories are unfamiliar, read [IUP vs IUPK](/en/news/iup-vs-iupk) first.

2. Check for overlap: this is now a revocation risk

Law No. 2 of 2025 (the fourth amendment to the 2009 Mining Law, in force 19 March 2025) added Article 171B. An IUP issued before the law took effect whose area overlaps in part or in full, based on the central government's evaluation, is revoked and returned to the state. The law covers three kinds of overlap:

  • a permit area overlapping another permit area issued by central or regional government for the same commodity;
  • a permit area overlapping an IUP that is still valid;
  • an IUP overlapping another IUP issued by central or regional government for the same commodity.

The government must publish the evaluation, revocation and return results openly, and the holder gets at most 14 days from that notice to submit a clarification. Further detail is left to a government regulation. Article 171C separately allows the ministry to reorganise all or part of the area of an IUP, IUPK, IPR or SIPB issued before the law if the holder has not met its obligations or has not carried out activities as required.

What to do: have the permit coordinates plotted against neighbouring permits. Fourteen days is a short time to respond, so ask whether the company has already received any evaluation notice.

3. Confirm an approved RKAB for this year and next

The RKAB (work plan and budget) is the annual approval that sets what a holder may explore or produce. Under Permen ESDM No. 17 of 2025 (signed 30 September 2025, promulgated and in force 3 October 2025), the RKAB again covers one year (Art. 3). That replaces the three-year approvals allowed under the 2023 regulation it revoked. Background on the instrument is in [what is RKAB](/en/news/what-is-rkab-indonesia).

Timing under Art. 4:

  • within 30 calendar days of a permit (or its extension) being issued, for the current year;
  • between 1 October and 15 November each year, for the following year.

The submission goes through the ministry's information system. Evaluation takes up to 5 working days. The company has 2 working days to fix each deficiency, with three rounds allowed. The decision follows within 8 working days. If a complete application gets no decision in time, the system issues approval automatically (Art. 6). After a rejection, the holder may reapply once (Art. 7).

Why it matters to a buyer: mining or selling without an approved RKAB, or submitting documents without legal validity to get one, allows the minister or governor to revoke the permit outright, without the usual warning and suspension steps (Art. 29). Asking for the approved RKAB is therefore the fastest test of whether production is lawful.

Today's date matters too. This article is published on 21 November 2026, after the 15 November window for 2027 RKAB submissions closed. Ask whether the 2027 RKAB was filed in time and what its status is.

4. Use the RKAB requirements as your document list

The regulation's approval conditions are a ready-made document request. For a production-stage RKAB, Art. 5(1)(b) requires:

  1. administrative data, pulled automatically from the OSS business-licensing system;
  2. a resource and reserve estimate report by a competent person (for metal minerals, non-metal minerals and coal);
  3. proof of payment of non-tax state revenue (PNBP) for mineral or coal natural resources;
  4. digital maps of further exploration, mining, land clearing and, where relevant, forest areas inside the permit area under the forest-use permit or approval;
  5. an appointed mine manager (kepala teknik tambang);
  6. proof that the production-stage reclamation guarantee was placed one year before the RKAB application year;
  7. production levels and mining locations not exceeding the maximum capacity in the approved feasibility study (FS) and environmental approval;
  8. mining locations matching the approved FS and environmental approval.

An exploration-stage RKAB needs the administrative data, PNBP payment proof, exploration maps, an exploration-stage reclamation guarantee and a mine manager.

If the company got its RKAB approved, these documents exist. Ask for them. Any gap between the documents and the seller's description is something to raise in negotiation. Related reading: [resource and reserve reporting](/en/news/indonesia-mineral-resource-reserve-reporting), [mining royalties and PNBP](/en/news/indonesia-mining-royalties), and [mine closure and reclamation obligations](/en/news/mine-closure-in-indonesia).

5. Compare production with the approved plan

Art. 17 prohibits production above the volume in the approved RKAB. Under Art. 30, breaching that leads to suspension for the rest of the year without a prior warning, plus a cut to the next RKAB's production plan for each tonne of excess. Compare reported output with the approved figure for each recent year.

Also check whether the FS still fits the operation. Art. 34 requires the holder to apply for approval of a revised FS when, among other things, reserves are added or changed, the FS reserves have been fully mined, the mining or processing method changes, or maximum capacity increases. A project whose growth plan relies on an FS change the government has not yet approved carries that approval as a risk.

6. Forest-area and environmental consistency

The RKAB rules tie mining to two other permits: the forest-use approval (for any permit area in a forest zone) and the environmental approval whose capacity limit the RKAB may not exceed. The ministry's RKAB technical guideline (Kepmen ESDM 341.K/MB.01/MEM.B/2025) includes an approval-letter template stating that all approved activities must take place outside forest areas, or in forest areas that already have the required approval. Ask for the forest-use approval map and the environmental approval, and check that both cover the areas being mined. Background: [mining in forest areas](/en/news/indonesia-mining-in-forest-areas) and [AMDAL and environmental permits](/en/news/indonesia-mining-environmental-permit-amdal).

7. Reporting record and any sanctions history

Production-stage holders must file quarterly reports (Art. 19). As amended by Permen ESDM No. 6 of 2026 (in force 12 June 2026), these cover RKAB implementation, wastewater quality, conservation, accident and occupational-disease statistics, workforce and training, reclamation, boundary markers, mine water and geotechnical monitoring, equipment use, safety-system audits and, for coal, any approved coal blending. The same amendment made blending subject to separate ministerial approval (new Art. 34A).

The sanctions ladder (Arts. 25–28) runs from a written warning (up to three, 30 calendar days each) to suspension (up to 60 calendar days) and then revocation. Ask for every warning letter and suspension notice. Missing quarterly reports and open warnings are liabilities that pass to you with the company.

8. Shareholding: past transfers and yours

A company holding an IUP or IUPK may not transfer share ownership without the minister's approval (Law 3/2020, Art. 93A; PP 96/2021, Art. 72(1)). As summarised in a Kompas legal column, the approval conditions include completed exploration, shown by resource and reserve data, plus financial documents: three years of audited financial statements, a tax clearance letter (surat keterangan fiskal) and proof of three years of land-rent (iuran tetap) payments. Shareholder changes must also be recorded in the ministry's system. Check that every past change in the company's deed history had approval, and make approval of your own transfer a condition precedent to closing. Foreign-ownership limits and divestment are covered in [foreign ownership in Indonesian mining](/en/news/foreign-ownership-indonesian-mining).

Catatan Teramine

*This section is Teramine's editorial analysis, not reported fact and not legal advice.*

  • Check the current system, not old certificates. Since the move to MinerbaOne and the one-year RKAB, a CnC certificate or an old three-year RKAB approval says little about the company's position today.
  • The quickest test of an operating asset is this year's approved RKAB. It shows the government accepted the PNBP payments, the reclamation guarantee, the competent-person report and the FS/environmental limits within the last year. If a seller cannot produce it, treat that as a serious warning.
  • Overlap is now a legal risk, not only a commercial one. Before Law 2/2025, an overlap meant a dispute with a neighbour. Under Art. 171B it can mean losing the permit, with a 14-day window to respond. Pay for a coordinate check early.
  • Every finding should become a contract term. Use the regulation's lists as your document request, then turn what you find into warranties, indemnities, a holdback or escrow, and ministerial approval as a closing condition.

Screening opportunities? Assets on the [Teramine marketplace](/en/marketplace) state commodity, location and scheme. For help verifying a specific permit or RKAB, see Teramine's [permit services](/en/layanan-izin). For what happens if a permit decision goes wrong, see [dispute resolution](/en/news/indonesia-mining-dispute-resolution).

Sources read for this article

  • Permen ESDM No. 17 of 2025 (full text, JDIH ESDM): Arts. 3, 4, 5, 6, 7, 17, 19, 25–30, 34, 35; metadata from JDIH BPK.
  • Permen ESDM No. 6 of 2026 (full text, JDIH ESDM): amended Art. 19, Art. 33, new Arts. 34A–34B.
  • Law No. 2 of 2025 (official PDF, peraturan.go.id): Arts. 171B and 171C.
  • SNP Lawyers (January 2026): consolidation of MODI/MOMI into MinerbaOne; status of CnC and Reconciliation Minutes.
  • Kabarbisnis, reporting BPK's first-semester 2024 audit summary (27 October 2024).
  • Kompas legal column (2 May 2023): share transfers under Law 3/2020 Art. 93A and PP 96/2021 Art. 72.

Sumber & Referensi

Berdasarkan keterangan resmi Peraturan Menteri ESDM No. 17 Tahun 2025 — RKAB preparation, submission, approval and reporting. Full text, JDIH ESDM. Read for: Art. 3 (one-year RKAB), Art. 4 (30 days; 1 Oct–15 Nov), Art. 5 (approval requirements), Art. 6 (5/2/8 working days, three rounds, automatic approval), Art. 7, Art. 17, Art. 19, Arts. 25–30 (sanctions), Art. 34 (FS changes), Art. 35 (transition). Signed 30 September 2025., …

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9

Artikel ini disusun ulang dengan konteks dan data tambahan. Sumber asli dicantumkan untuk transparansi.

Due DiligenceIUPRKABMinerbaOnePermen ESDM 17/2025Law 2/2025Reclamation GuaranteeMining InvestmentIndonesia
Bagikan

Peluang Tambang Terkait

Proyek tambang yang sedang ditawarkan di Teramine untuk komoditas ini.

Lihat Peluang Tambang

Mencari peluang investasi tambang di Indonesia?

Lihat proyek IUP yang tersedia untuk take over, joint operation, dan joint venture di Teramine.

Explore Mining Opportunities

Punya aset atau proyek tambang?

Publikasikan peluang tambang Anda kepada investor dan jaringan Teramine.

Submit Mining Opportunity

Ada Pertanyaan?

Konsultasi gratis dengan tim ahli kami

Hubungi Kami

Artikel Terkait

Indonesia Mining Companies: the State Holding, Its Members and the Foreign Operators
Investasi TambangMining Intelligence

Indonesia Mining Companies: the State Holding, Its Members and the Foreign Operators

USGS lists five companies inside MIND ID, the state mining holding, while MIND ID's own site now shows six members holding stakes from 34% to 100%. Here is who owns what, what each company produces, and how the foreign-owned operators fit alongside them.

27 Sep 20268 min read
NikelTembagaTimahBauksitBatubaraEmas
Indonesia Mining Tax Incentives: What the Tax Holiday and Tax Allowance Actually Cover for Mines and Smelters
Kebijakan TambangPenjelasan

Indonesia Mining Tax Incentives: What the Tax Holiday and Tax Allowance Actually Cover for Mines and Smelters

Indonesia has two main corporate income tax incentives an investor in minerals will hear about: the tax holiday for pioneer industries and the tax allowance for listed business fields. Read from the regulation texts, neither one covers digging ore out of the ground. Both are aimed at processing: smelters, refineries and coal conversion. The tax holiday's filing window under PMK 69/2024 closed on 31 December 2025, and the 15% global minimum tax already cuts into it for large groups. This explainer sets out who qualifies, what each incentive is worth, and what is still unsettled.

20 Nov 202611 min read
NikelTembagaBauksitTimahEmasBatubara
Indonesia's Mineral Downstreaming: The Processing Capacity Being Built, Commodity by Commodity
Investasi TambangMining Intelligence

Indonesia's Mineral Downstreaming: The Processing Capacity Being Built, Commodity by Commodity

Indonesia's downstreaming roadmap runs to 2045; the plant on the ground is narrower and countable. ESDM's own count as of 2024 is 131 nickel smelters at some stage of delivery demanding 438.3 million tonnes of ore a year, three world-class copper smelters heading for about 1 million tonnes of cathode capacity, eight alumina refineries and aluminium smelters still under construction, and a copper fleet expected to yield lead as a by-product. This is the capacity, commodity by commodity, and the ore arithmetic under it.

30 Sep 20269 min read
NikelTembagaBauksit