Indonesia can revoke a mining licence on three legal grounds, usually after a fixed ladder of warnings and suspension, and sometimes straight away. Since 2022 it has used that power at scale: 2,078 permits in one programme, 190 suspensions over reclamation guarantees in 2025, a 3,500-hectare gold concession in Papua in October 2026. This explainer sets out the rules from the texts and what revocation leaves behind for the holder and for anyone buying in.

For a foreign investor, the question about an Indonesian mining licence is not only whether it is valid today. It is whether it can be taken away, how fast, and what the holder still owes when it is. Indonesia has answered that question in practice several times since 2022, and the answers have been large.

This explainer reads the rules from the texts: the 2020 amendment to the Mineral and Coal Mining Law (Law No. 3 of 2020), Government Regulation (PP) No. 96 of 2021 on mining business activities, and its second amendment PP No. 39 of 2025. It then sets the cases against them. Article numbers are given so they can be checked.

The three legal grounds

Article 119 of the Mining Law, as rewritten in 2020, allows the Minister to revoke an IUP or IUPK if:

  1. the holder does not meet the obligations set in the licence and in the laws and regulations;
  2. the holder commits a criminal offence under the Mining Law; or
  3. the holder is declared bankrupt.

The first ground is broad. Missed reports, unpaid guarantees, work outside the licence area or without a forest-use approval can all be framed as failures to meet obligations. It is the ground cited in the most recent large case below.

Revocation is also one of four administrative sanctions in the Law. Article 151(2) lists them as a written warning, a fine, temporary suspension of part or all of exploration or production, and revocation of the IUP, IUPK, IPR, SIPB or the IUP for sales.

The ladder: warning, suspension, revocation

PP 96/2021 turns the sanction list into a sequence, and the timings are fixed in the text:

StepWhat the rule saysSource
Written warningGiven up to three times, each with a 30 calendar-day periodPP 96/2021 Art. 186
Temporary suspensionIf the holder still has not complied, part or all of exploration or production is suspended for up to 60 calendar days after the warning period endsArt. 187(1)–(2)
RevocationIf the obligation is still unmet when the suspension period ends, the licence is revokedArt. 187(3)
LiftingIf the holder complies during suspension, the suspension is liftedArt. 187(4)

On those numbers, the full ladder for a single unremedied breach runs to roughly five months: three 30-day warnings and a 60-day suspension. That is a reading of the maximums in the text, not a guarantee that every case runs that long.

Fines sit outside the ladder. PP 96/2021 Art. 185(3) applies them only to breaches of two named provisions, on top of the other sanctions.

When the ladder is skipped

The same regulation lets the Minister revoke without the warning and suspension steps in defined conditions. As amended by PP 39/2025 (Art. 188), those are:

  • a criminal violation by the holder, established by a final and binding court decision;
  • the Minister's evaluation finds the holder has caused environmental damage and not applied good mining practice;
  • mining by an SIPB holder (the small permit for certain construction rock) without an approved mining plan; or
  • the holder is declared bankrupt.

The second condition matters most to investors. It does not require a court ruling. It rests on the Minister's evaluation.

A separate track: overlapping licences

PP 39/2025 added a revocation route that has nothing to do with misconduct. Under Art. 199A, an IUP issued before the 2025 amendment to the Mining Law (Law No. 2 of 2025) whose licence area overlaps, in whole or in part, with another licence area or a valid IUP for the same commodity, is revoked and returned to the state based on the central government's evaluation.

The holder gets 14 days from the revocation date to object, and must attach:

  • evidence that there is no overlap;
  • proof of ownership or control of land in the licence area;
  • proof of land-rent (*iuran tetap*) payment for the last three years;
  • the approved RKAB (annual work plan and budget);
  • a clean and clear certificate issued in the company's name; and
  • the implementing permits issued by ministries, agencies or regional governments.

If the objection is rejected, or filed after 14 days, the revocation is final and binding (Art. 199A(5)).

What revocation does not cancel

Losing the licence does not end the holder's liabilities. The texts are consistent on this:

  • The ex-holder must meet and settle its obligations, and receives a certificate from the Minister once it has (Law Art. 121).
  • It must hand over all exploration and production data to the Minister (Art. 123).
  • It must carry out reclamation and post-mining work to 100% success and place the reclamation and post-mining guarantees (Art. 123A(2)).
  • PP 39/2025 repeats that the holder must settle all obligations to the state when a licence is revoked or expires, and that an ex-holder who keeps mining is subject to sanctions (Art. 188A(1), (3)).

Stockpiled ore is handled separately. An ex-holder may apply to sell ore or coal already in its stockpile, but only with the Minister's approval and within six months of revocation (PP 96/2021 Art. 183(1), (6)). That option is not available where the licence was revoked for a criminal mining offence (Art. 183(2)). If no application is made, or it is refused, the stockpile becomes goods controlled by the state and is sold by auction through the state assets and auction office, with the proceeds booked as non-tax state revenue (Art. 184, as amended by PP 39/2025).

Where the ground goes next

A revoked licence area goes back to the state. The Law says it is offered to state-owned companies, regional companies, private companies, cooperatives or individual companies through the mechanisms in the Law (Art. 122). PP 39/2025 adds that the offer follows the Minister's evaluation (Art. 188A(2)). For how areas are re-awarded, see our [licence auction explainer](/en/news/indonesia-mining-licence-auction).

How it has been used: a timeline

January 2022 — the mass revocation. President Joko Widodo announced on 6 January 2022 that the government had revoked 2,078 mining permits because the holders had never submitted a work plan. The following day Investment Minister Bahlil Lahadalia said 2,343 permits were under review, of which 2,078 would be revoked in the first stage starting 10 January, with 265 still being verified. Some holders, he said, had been given licences and sold them on.

April 2022 — progress and redistribution. By 24 April 2022 the task force had revoked 1,118 IUPs covering 2,707,443 hectares, and Bahlil asked for the deadline to be extended to May 2022. He listed misuse such as mortgaging an IUP and holding permits for later use, and said the released areas would go to community organisations, regional and village-owned enterprises, cooperatives and small businesses. In March 2024 Tempo reported criticism that the programme had been selective and lacked clear criteria.

June 2025 — Raja Ampat. On 10 June 2025 the government revoked four of five nickel licences in the Raja Ampat archipelago in Southwest Papua — PT Anugerah Surya Pratama, PT Kawei Sejahtera Mining, PT Mulia Raymond Perkasa and PT Nurham — citing environmental violations. The fifth, PT Gag Nikel, was kept because Gag Island lies outside the UNESCO geopark, the minister said.

September–October 2025 — suspension over guarantees. By a Director General of Minerals and Coal letter dated 18 September 2025 (No. T-1533/MB.07/DJB.T/2025), the energy ministry suspended 190 IUPs whose holders had not placed reclamation and post-mining guarantees: 90 coal, 3 asphalt and 97 mineral licences. The Indonesia Mining Association, the coal miners' association APBI and the nickel miners' association APNI each said none of their members were on the list. On 15 October 2025 Bahlil said four licences had been reopened out of 44 companies that had applied, leaving 186 suspended. This is the ladder in action: suspension first, with reinstatement on compliance.

December 2025 — the bankruptcy ground tested. Two receivers and an advocate asked the Constitutional Court to read the bankruptcy ground in Art. 119(c) as not applying where a commercial court has allowed a bankrupt holder to continue trading as a going concern (case No. 182/PUU-XXIII/2025). The applicants withdrew, and the Court granted the withdrawal on 17 December 2025. The ground stands as written.

October 2026 — Kristalin Eka Lestari. The licence of PT Kristalin Eka Lestari over 3,500 hectares in Nabire, Central Papua, was revoked by a decree of the Minister of Investment and Downstreaming dated 12 October 2026. Attorney General Sanitiar Burhanuddin said the forest-area enforcement task force (Satgas PKH) had found mining inside a forest area without forest-use approval, and that the company had not placed reclamation guarantees or carried out reclamation; he cited Art. 119(a). He said the company still owes environmental restoration, taxes and royalties and workers' severance. The defence minister, who leads the task force's steering committee, said the area was planned to go to state miner ANTAM as operator and investor.

The ground was not new in 2026. The same task force, set up under Presidential Regulation No. 5 of 2025, was behind an order in January 2026 revoking licences of 28 companies, six of them in mining, plantations and timber, Indonesia Business Post reported.

Challenging a revocation

A revocation is an administrative decision, and the general administrative-law route applies. A legal summary by KALD Law Office sets out the sequence under Law No. 30 of 2014 on Government Administration: an objection to the issuing official within 21 working days of the decision being announced, which the official must decide within 10 working days; then a claim at the State Administrative Court (PTUN), filed within 90 days of receiving the decision on the objection, under Supreme Court Regulation No. 6 of 2018. The overlap track above has its own shorter 14-day objection window. Neither guarantees the licence back. For disputes that go beyond domestic courts, see [mining dispute resolution](/en/news/indonesia-mining-dispute-resolution).

Catatan Teramine

*This section is editorial analysis, not a statement of fact.*

  1. Reclamation guarantees and forest-use approvals are now the main revocation risks. The 2025 suspensions and the 2026 Papua case both turned on them. Revocation in 2022 was about idle licences. In 2025–2026 it has mostly been about obligations a holder skipped. A licence whose guarantee and forest approval are in order is much harder to touch.
  2. The ministerial evaluation route is the one to price. The ladder gives months of warning. The environmental-damage route in Art. 188(b) gives none and needs no court ruling. Where an asset sits near a protected or politically visible area, as Raja Ampat showed, that route is the realistic risk.
  3. Liabilities survive the licence. A buyer of shares in a company whose IUP is later revoked still owns a company that owes reclamation, royalties and severance. Due diligence should test those balances, not only the licence certificate. Our [due diligence checklist](/en/news/indonesia-mining-due-diligence-checklist) covers what to request.
  4. Revoked ground tends to go to state or community entities first. The 2022 promises to community organisations and the planned ANTAM handover in Papua point the same way. Foreign capital will usually meet that ground later, as a partner, not at the point of reallocation. That is an inference from the cases, not a rule in the texts.

What this article does not cover

  • Criminal penalties. Unlicensed mining and other offences carry prison terms and fines under the Mining Law; this piece covers the licence, not the prosecution.
  • Forestry permits. Revocation of forest-use approvals runs under forestry law; see [mining in forest areas](/en/news/indonesia-mining-in-forest-areas).
  • Contracts of work and coal contracts (KK/PKP2B) before their conversion to IUPK; see [IUP vs IUPK](/en/news/iup-vs-iupk).
  • Regional practice. Where licensing for certain commodities is delegated to provinces, local procedure may differ.

If you need help keeping a licence compliant, answering a warning letter or preparing an objection, see our [permit services](/en/layanan-izin). To look at mining assets on offer, browse the [marketplace](/en/marketplace).

Sumber & Referensi

Berdasarkan keterangan resmi Undang-Undang No. 3 Tahun 2020 tentang Perubahan atas UU 4/2009 tentang Pertambangan Mineral dan Batubara, promulgated 10 June 2020 (LN 2020 No. 147) — official text. Read for: Art. 118 (voluntary return), Art. 119 (three revocation grounds), Art. 121 (ex-holder obligations and certificate), Art. 122 (area returned and offered), Art. 123 (data handover), Art. 123A (reclamation and post-mining to 100%), Art. 151(2) (four administrative sanctions)., …

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15

Artikel ini disusun ulang dengan konteks dan data tambahan. Sumber asli dicantumkan untuk transparansi.

IUP RevocationMining PermitAdministrative SanctionsUU 3/2020PP 96/2021PP 39/2025Reclamation GuaranteeIndonesia
Bagikan

Peluang Tambang Terkait

Proyek tambang yang sedang ditawarkan di Teramine untuk komoditas ini.

Lihat Peluang Tambang

Mencari peluang investasi tambang di Indonesia?

Lihat proyek IUP yang tersedia untuk take over, joint operation, dan joint venture di Teramine.

Explore Mining Opportunities

Punya aset atau proyek tambang?

Publikasikan peluang tambang Anda kepada investor dan jaringan Teramine.

Submit Mining Opportunity

Ada Pertanyaan?

Konsultasi gratis dengan tim ahli kami

Hubungi Kami

Artikel Terkait

Mineral Exploration in Indonesia: The Exploration IUP, Its Deadlines and What Happens If You Stall
Kebijakan TambangPenjelasan

Mineral Exploration in Indonesia: The Exploration IUP, Its Deadlines and What Happens If You Stall

An Indonesian exploration licence runs for a fixed term — eight years for metal minerals, seven for coal — and since late 2025 it comes with a cash guarantee, quarterly progress reports, and a rule that three reports in a row with no progress can cost the licence. This explainer reads the government regulation and the 2025 ministerial rules so a foreign investor knows what an exploration-stage asset actually obliges its holder to do.

23 Nov 20269 min read
NikelEmasTembagaBatubara
Indonesia Mining Dispute Resolution: Courts, Arbitration and Investment Treaties for Foreign Investors
Kebijakan TambangPenjelasan

Indonesia Mining Dispute Resolution: Courts, Arbitration and Investment Treaties for Foreign Investors

A foreign mining investor in Indonesia can end up in three different dispute systems: the Indonesian courts, commercial arbitration (domestic or international), and investor-state arbitration under an investment treaty. Read from the statutes, the mining law sends disputes over a permit to Indonesian courts and domestic arbitration, while the investment law points foreign investors to international arbitration that the parties must agree on. This explainer sets out each route, how an award is enforced in Indonesia, which treaties still protect investors after Indonesia ended dozens of BITs, and what two public mining cases at ICSID show.

21 Nov 202611 min read
BatubaraTembagaEmasNikel
Indonesia Mining Tax Incentives: What the Tax Holiday and Tax Allowance Actually Cover for Mines and Smelters
Kebijakan TambangPenjelasan

Indonesia Mining Tax Incentives: What the Tax Holiday and Tax Allowance Actually Cover for Mines and Smelters

Indonesia has two main corporate income tax incentives an investor in minerals will hear about: the tax holiday for pioneer industries and the tax allowance for listed business fields. Read from the regulation texts, neither one covers digging ore out of the ground. Both are aimed at processing: smelters, refineries and coal conversion. The tax holiday's filing window under PMK 69/2024 closed on 31 December 2025, and the 15% global minimum tax already cuts into it for large groups. This explainer sets out who qualifies, what each incentive is worth, and what is still unsettled.

20 Nov 202611 min read
NikelTembagaBauksitTimahEmasBatubara