Indonesia Mining Tax Incentives: What the Tax Holiday and Tax Allowance Actually Cover for Mines and Smelters

By Teramine EditorialPublished 20 November 202611 min readCompany: Kementerian Keuangan; Direktorat Jenderal Pajak; Kementerian ESDM; BKPM

Indonesia has two main corporate income tax incentives an investor in minerals will hear about: the tax holiday for pioneer industries and the tax allowance for listed business fields. Read from the regulation texts, neither one covers digging ore out of the ground. Both are aimed at processing: smelters, refineries and coal conversion. The tax holiday's filing window under PMK 69/2024 closed on 31 December 2025, and the 15% global minimum tax already cuts into it for large groups. This explainer sets out who qualifies, what each incentive is worth, and what is still unsettled.

Foreign investors looking at Indonesian minerals are often told that the country offers generous tax incentives. That is true, but it is easy to read too much into it. Indonesia's two main corporate income tax incentives, the tax holiday and the tax allowance, are written for *processing* investment. Neither, on the texts read for this article, rewards opening a mine on its own. And the tax holiday, the bigger of the two, is in a holding pattern: its filing window closed at the end of 2025, and its value to large multinational groups has been reduced by the 15% global minimum tax.

This explainer reads both incentives from the regulations themselves: who can use them, what they are worth, and which parts of a mining value chain they reach. It is a map for the questions you will put to a tax adviser, not a substitute for one. Royalties and other non-tax state revenue are a separate regime, covered in [Indonesia mining royalties](/en/news/indonesia-mining-royalties).

The two incentives at a glance

Tax holidayTax allowance
Legal basisPMK 130/PMK.010/2020, as amended by PMK 69/2024Government Regulation (PP) 78/2019; procedures in PMK 81/2024, Arts. 407–422
WhoIndonesian legal entity making a new investment in a pioneer industryDomestic corporate taxpayer investing (new or expansion) in a listed business field
Minimum investmentIDR 100 billion planned new investmentNo single figure; each field's own requirements are set in the PP's annexes
What you getReduction of corporate income tax due: 50% or 100%, for 5 to 20 years, plus a 2-year tail30% of qualifying fixed-asset investment deducted from net income over 6 years, plus accelerated depreciation, 10% dividend withholding and longer loss carry-forward
Mining relevanceUpstream basic metals (iron and steel, and non-ferrous)Smelter construction or expansion for listed ores; coal gasification at mine site; coal liquefaction and upgrading in listed provinces
Can you combine them?No. An investment that already has a tax allowance decision does not qualifyNo. An investment with a tax holiday cannot also get the allowance

The tax holiday: pioneer industry, new investment

The tax holiday is a reduction of corporate income tax on income from the investment's main business activity. It is set out in Finance Minister Regulation (PMK) 130/PMK.010/2020, signed on 18 September 2020 and amended by PMK 69/2024, signed on 8 October 2024 and in force from its promulgation on 9 October 2024.

How much it is worth

The size of the reduction and how long it lasts both depend on the planned new investment (PMK 130/2020, Art. 2):

Planned new investmentReduction of corporate income taxMain periodThen, for 2 more tax years
IDR 100 bn to under IDR 500 bn50%5 tax years25%
IDR 500 bn to under IDR 1 trillion100%5 tax years50%
IDR 1 trillion to under IDR 5 trillion100%7 tax years50%
IDR 5 trillion to under IDR 15 trillion100%10 tax years50%
IDR 15 trillion to under IDR 30 trillion100%15 tax years50%
IDR 30 trillion and above100%20 tax years50%

Who qualifies

Under Article 3(1) as amended by PMK 69/2024, the taxpayer must:

  1. be in a pioneer industry;
  2. be an Indonesian legal entity, so a foreign investor uses a local PT, not an offshore company;
  3. make a new investment that has not already received a tax holiday decision or rejection, a tax allowance under Article 31A of the Income Tax Law, a labour-intensive industry incentive, a Special Economic Zone income tax facility, or a facility in the new capital (IKN);
  4. plan a new investment of at least IDR 100 billion;
  5. meet the separate debt-to-equity ratio rules; and
  6. commit to start realising the investment within one year of the reduction decision.

Where mining sits in the pioneer list

Article 3(2) lists 18 pioneer industries. For minerals, the relevant one is the first: upstream basic metal industries, iron and steel or non-iron and steel, with or without integrated derivatives. Others on the list include oil and gas refining, basic organic chemicals from oil, gas *or coal*, basic inorganic chemicals, and economic infrastructure. Mining as extraction is not on the list.

Which business codes and products fall under each heading is set by a separate Investment Coordinating Board (BKPM) regulation (Art. 3(3)). That regulation was not read for this article, so we do not say here which specific smelter products are covered.

A project outside the 18 headings can still apply through a points test. It must score at least 80 on the quantitative pioneer criteria. BKPM assesses the self-calculated score within five working days of a complete application (Art. 5, as amended).

Using it, and the reporting that follows

The applicant files through the OSS online licensing system. Approval does not start the clock. The reduction runs from the tax year of commercial production, and only after a Minister of Finance decision based on a Directorate General of Taxes field audit of the realised investment (Art. 12). After that, the holder reports investment and production through OSS every year, within 30 days after the tax year ends. A holder that misses a report or the one-year realisation commitment gets a warning letter first. If it has still not complied 14 days after the warning, it can be proposed for a tax audit (Art. 16).

The filing window closed on 31 December 2025

PMK 69/2024 rewrote Article 21: the tax holiday is granted on proposals that reach the Minister of Finance no later than 31 December 2025. Government statements since then say the facility will continue. Tax-industry reports say Finance Minister Purbaya Yudhi Sadewa decided to extend it into 2026 through a new PMK. In October 2026, Coordinating Minister for the Economy Airlangga Hartarto said the government would keep the tax holiday despite the global minimum tax and was preparing new rules aligned with it. We could not find an issued replacement regulation in the sources read for this article. Treat new applications as dependent on that regulation, and confirm its status before you build a tax holiday into a financial model.

The global minimum tax: the tax holiday is now worth less to large groups

Indonesia applies the OECD 15% global minimum tax through PMK 136/2024, with operating procedures in DGT regulation PER-6/PJ/2026. It covers multinational groups with consolidated gross revenue of at least EUR 750 million, according to the Directorate General of Taxes. PMK 69/2024 inserted Article 15A into the tax holiday rules. A holder that falls within those rules pays a domestic minimum top-up tax, and this applies even to tax holiday decisions issued before PMK 69/2024 took effect.

In practice, a 100% tax holiday cannot take an in-scope group's Indonesian effective rate below 15%. The difference is collected as top-up tax. For a smaller sponsor below the EUR 750 million threshold, the reduction keeps its full value.

The tax allowance: listed fields, including smelters

The tax allowance comes from PP 78/2019, signed on 12 November 2019 and promulgated on 13 November 2019. It came into force 30 days after promulgation. The Directorate General of Taxes said at the time that it widened the eligible business codes from 145 to 183. The Finance Ministry's procedural rules for it are now in PMK 81/2024, Articles 407–422.

What it gives (PP 78/2019, Art. 3)

  • Net income reduction of 30% of the investment in tangible fixed assets, including land, used for the main business activity. It is deducted at 5% a year for six years, starting from commercial production.
  • Accelerated depreciation and amortisation. For example, Group I non-building assets are depreciated over 2 years instead of the normal schedule, and permanent buildings over 10 years.
  • 10% income tax on dividends paid to a foreign shareholder (not a permanent establishment), or the lower treaty rate.
  • Loss carry-forward longer than 5 years, up to 10. Extra years are added for, among other things, investing in an industrial or bonded zone, spending at least IDR 10 billion on economic or social infrastructure at the site, using at least 70% domestic raw materials or components by the second tax year, adding 300 or 600 Indonesian workers and keeping them for four years, spending at least 5% of the investment on domestic R&D within five years, or exporting at least 30% of sales.

Which mining activities are listed

Annex I of PP 78/2019 covers business fields that qualify anywhere in Indonesia. Its mining entries are about processing, not extraction. Under the heading for metal ore mining, each of the following has the product scope "processing and/or refining" and the requirement "new construction and/or expansion of a smelter":

Annex I no.OreKBLI 2017
31Iron sand07101
32Iron ore07102
33Uranium and thorium07210
34Tin ore07291
35Lead ore07292
36Bauxite / aluminium07293
37Copper ore07294
38Nickel ore07295
39Manganese ore07296
40Other non-iron ores: zinc, zirconium, chromium, antimony, ilmenite, rutile, rare earths07299
41Gold and silver ore07301

Annex I also lists coal gasification at the mine site (no. 29, KBLI 05102) and geothermal exploration and drilling (no. 30). Annex II covers fields that qualify only in named regions. It includes coal liquefaction and coal upgrading (KBLI 05101) in Aceh, West Sumatra, Riau, Jambi, South Sumatra, Bengkulu, Central, South, East and North Kalimantan, West Papua and Papua.

Rules that catch investors out

  • Expansion has a narrow meaning. Replacing or adding machinery on a production line that is already in commercial production does not count (Art. 2(2)).
  • Apply before commercial production. The application goes through OSS, either together with the business identification number (NIB) registration or within one year after the OSS business licence is issued (Art. 5). The DGT said in 2019 that decisions were issued within five working days.
  • The assets are locked. Assets that earned the 30% reduction cannot be used for another purpose or transferred, unless replaced with new assets, for six years from commercial production or for their useful life, whichever is longer (Art. 6).
  • Breaches are costly. The facility is revoked, tax and penalties become due, and the taxpayer can never again receive a tax allowance (Art. 7).
  • No double-dipping. An investment that has a tax holiday cannot also get the tax allowance (Art. 8(2)).

Changes the energy ministry has asked for

In an evaluation dated 31 December 2024, the Ministry of Energy and Mineral Resources' legal bureau recommended replacing PP 78/2019 with a new regulation. Its main proposals were:

  • require coal gasification, liquefaction and upgrading to be integrated with an IUP or IUPK to qualify;
  • move liquefaction and upgrading from the regional Annex II to the nationwide Annex I;
  • add coking, briquetting and coal-water slurry; and
  • update electricity business codes to KBLI 2020.

These are recommendations, not law. The annex table above is the text as enacted in 2019.

What this means for an investor

  • A pure mining project should not count on either incentive. On the texts read here, extraction alone is not a pioneer industry, and the tax allowance's mining entries are tied to building or expanding a smelter. Where you can find incentives is downstream: processing, refining and coal conversion. That fits the government's downstreaming policy, covered in [Indonesia's mineral processing and downstreaming](/en/news/indonesia-mineral-processing-downstreaming) and [nickel smelters in Indonesia](/en/news/nickel-smelter-indonesia).
  • Choose one incentive. The tax holiday and the tax allowance exclude each other. The tax holiday removes tax on profits. The tax allowance lowers taxable income and improves early-year cash flow through depreciation. Which one is worth more depends on the project's profit profile and on whether the group is subject to the global minimum tax.
  • Check the group's size. For a group with EUR 750 million or more in consolidated revenue, a tax holiday's value is capped by the 15% minimum. Model the top-up tax, not a zero rate.
  • Timing comes first. Both incentives must be applied for before commercial production. A project that starts production first loses the right to apply.
  • Make sure the structure fits. Both incentives go to an Indonesian taxpayer, so the investment has to sit in the local PT. Ownership limits for foreign investors are covered in [foreign ownership in Indonesian mining](/en/news/foreign-ownership-indonesian-mining). Export proceeds have their own onshore retention rules, covered in [Indonesia's export proceeds retention rule](/en/news/indonesia-export-proceeds-retention-mining).

If you are looking for processing-stage assets, browse the [Teramine marketplace](/en/marketplace). For permit and licensing work around a smelter or IUP, see [Teramine permit services](/en/layanan-izin).

What could not be sourced, and is therefore not stated

  • Whether a replacement tax holiday regulation has been issued after the 31 December 2025 deadline. Officials' statements up to October 2026 describe one being prepared. We did not find an issued number.
  • The BKPM list of business codes and products under the "upstream basic metals" pioneer heading, so we do not say which smelter products qualify for the tax holiday.
  • The standard corporate income tax rate and any separate rules on contract-of-work or IUPK tax stability, which were not in the documents read.
  • Usage figures, such as how many mining or smelter projects hold either incentive.

Catatan Teramine

*This section is Teramine's editorial assessment, not a statement of fact from any regulator or source named here.*

For an Indonesian project, the incentive question is usually put the wrong way round. Sponsors ask which incentive applies to their mine. The regulations answer that incentives apply to what is built downstream of the mine. Mining comes into the tax incentive rules only once it adds processing. A sponsor with ore and no processing plan should treat the incentives as a reason to look at processing partners, not as a line in its own model.

The second point is about direction. The tax holiday's legal window has lapsed, a replacement is described but not visible, and the global minimum tax makes a full exemption worth less to the groups most able to build a smelter. Until the new text is published, the safer planning assumption is that the tax allowance under PP 78/2019 is the incentive that is in force today, and that any tax holiday is an upside to confirm, not a base case.

Sources

  • PMK 130/PMK.010/2020, consolidated text via Ortax Data Center: Art. 2 (reduction tiers and periods), Art. 3 (criteria), Art. 12 (utilisation).
  • PMK 69/2024, text via Ortax Data Center: amended Arts. 3, 4, 5, 12, 16; new Art. 15A (domestic minimum top-up tax); Art. 21 (31 December 2025 deadline).
  • PP 78/2019, official PDF via peraturan.go.id: Arts. 2–8; Annex I nos. 29–41; Annex II no. 2.
  • Directorate General of Taxes, press release on PP 78/2019, 4 December 2019; article on corporate income tax facilities, 23 July 2026; news on the global minimum tax dialogue, 10 November 2026.
  • Ministry of Energy and Mineral Resources, Legal Bureau: evaluation and recommendations on PP 78/2019, 31 December 2024.
  • BDO: summary of PMK 136/2024 (issued 31 December 2024; applies from fiscal years starting 1 January 2025).
  • MUC Consulting (22 October 2026) and Benardhy Consulting: reporting on the tax holiday extension and replacement regulation.

Sources & References

According to an official statement from Peraturan Pemerintah No. 78 Tahun 2019 tentang Fasilitas Pajak Penghasilan untuk Penanaman Modal di Bidang-Bidang Usaha Tertentu dan/atau di Daerah-Daerah Tertentu — official PDF (LN 2019 No. 218). Read for: Arts. 2–8 (eligibility, the 30% net income reduction, accelerated depreciation, 10% dividend WHT, loss carry-forward extensions, OSS application before commercial production, asset lock, sanctions, no combination with tax holiday); Annex I nos. 29–41 (coal gasification at mine site; geothermal; smelter construction/expansion for listed ores) and Annex II no. 2 (coal liquefaction/upgrading by province). Signed 12 Nov 2019, promulgated 13 Nov 2019., …

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10

This article was rewritten with added context and data. Original sources are listed for transparency.

Tax HolidayTax AllowancePMK 130/2020PMK 69/2024PP 78/2019Global Minimum TaxSmelterMining InvestmentIndonesia Mining Regulation
Share

Related Mining Opportunities

Mining projects currently offered on Teramine for this commodity.

Browse Mining Opportunities

Looking for mining investment opportunities in Indonesia?

Browse IUP projects available for take over, joint operation and joint venture on Teramine.

Explore Mining Opportunities

Own a mining asset or project?

Publish your mining opportunity to Teramine's investor network.

Submit Mining Opportunity

Ada Pertanyaan?

Konsultasi gratis dengan tim ahli kami

Hubungi Kami

Related Articles

Indonesia Mining Companies: the State Holding, Its Members and the Foreign Operators
Mining InvestmentMining Intelligence

Indonesia Mining Companies: the State Holding, Its Members and the Foreign Operators

USGS lists five companies inside MIND ID, the state mining holding, while MIND ID's own site now shows six members holding stakes from 34% to 100%. Here is who owns what, what each company produces, and how the foreign-owned operators fit alongside them.

27 Sep 20268 min read
NickelCopperTinBauxiteCoalGold
Indonesia's Mineral Export Ban: What the Nickel and Bauxite Prohibitions Actually Produced
Mining PolicyMining Intelligence

Indonesia's Mineral Export Ban: What the Nickel and Bauxite Prohibitions Actually Produced

Indonesia prohibited exports of unprocessed minerals from January 2014, then applied the ban commodity by commodity: nickel ore from 1 January 2020, bauxite from June 2023, copper concentrate exempted to May 2024. USGS records the result — ferronickel exports at US$15 billion and intermediate nickel products near US$7 billion by 2023, bauxite export value down to US$68 million, and a surplus market that cut the nickel price 11 percent in 2025.

28 Sep 202612 min read
NickelBauxiteCopper
Indonesia's Export Proceeds Retention Rule for Mining: 100% Onshore for 12 Months, State Banks, and the 50% Rupiah Cap
Mining PolicyRegulation

Indonesia's Export Proceeds Retention Rule for Mining: 100% Onshore for 12 Months, State Banks, and the 50% Rupiah Cap

Since 1 March 2025 a mining exporter in Indonesia (oil and gas aside) must hold 100% of its export proceeds onshore for at least 12 months. Two amendments in 2026 moved those proceeds into state-owned banks, capped rupiah conversion at 50% of export value, widened what the money can be spent on, and opened a 30%-for-3-months exception for mining exports under bilateral trade arrangements. This is how the DHE SDA rule works, read from the regulations themselves.

20 Nov 202611 min read
CoalNickel