RECLAMATION GUARANTEE

Reclamation guarantee: how to calculate it, prepare it, and prove it

Four steps, two worked examples, the complete 36-province standards table from Kepmen ESDM 344/2025, and a worksheet you can audit — instead of a number in a box.

Source: Kepmen ESDM 344.K/MB.01/MEM.B/2025 · Lampiran II · Matrik 1 · read from the official PDF on 2 November 2026

1. The obligation

  • Who: every IUP/IUPK holder at the production-operation stage — before that stage there is no guarantee.
  • How much: at least the standard cost in Lampiran II, calculated on the planned clearing area for the first five-year period.
  • When: 100% placed within 20 working days of the reclamation plan being approved.
  • Form: a time deposit at a government bank, in Rupiah or US dollars.

2. Calculate it in four steps

Guarantee = area cleared (ha) × provincial standard (million Rp/ha, year of work) × commodity factor

Commodity factor: 50% for bauxite, 100% for everything else.

Example A — coal, East Kalimantan, 10 ha, 2026

10 × 162,7 × 1 = 1.627

Rp 1.627.000.000

Example B — bauxite, East Kalimantan, 10 ha, 2026

10 × 162,7 × 50% = 813,5

Rp 813.500.000

Figures in million Rupiah. The official amount is set in the approved reclamation plan and may differ with field conditions.

3. Complete cost standards, 36 provinces

Million Rupiah per hectare, per year of execution. Extracted from Lampiran II, Matrik 1 of the decree's own PDF.

Province202520262027202820292030
Aceh147.1155.9165.3175.2185.7196.9
Sumatera Utara147.1155.9165.3175.2185.7196.9
Riau159.9169.5179.7190.4201.9214.0
Kepulauan Riau117.8124.9132.4140.3148.7157.6
Sumatera Barat147.1155.9165.3175.2185.7196.9
Jambi159.9169.5179.7190.4201.9214.0
Bengkulu159.9169.5179.7190.4201.9214.0
Sumatera Selatan185.5196.6208.4220.9234.2248.2
Kepulauan Bangka Belitung124.7132.2140.1148.5157.4166.9
Lampung127.9135.6143.7152.3161.5171.2
Banten159.9169.5179.7190.4201.9214.0
Jawa Barat159.9169.5179.7190.4201.9214.0
Jawa Tengah159.9169.5179.7190.4201.9214.0
D.I Yogyakarta159.9169.5179.7190.4201.9214.0
Jawa Timur159.9169.5179.7190.4201.9214.0
Nusa Tenggara Barat185.5196.6208.4220.9234.2248.2
Nusa Tenggara Timur185.5196.6208.4220.9234.2248.2
Kalimantan Utara179.1189.8201.2213.3226.1239.7
Kalimantan Selatan172.7183.1194.0205.7218.0231.1
Kalimantan Tengah172.7183.1194.0205.7218.0231.1
Kalimantan Timur153.5162.7172.5182.8193.8205.4
Kalimantan Barat147.1155.9165.3175.2185.7196.9
Sulawesi Barat199.3211.3223.9237.4251.6266.7
Sulawesi Selatan199.3211.3223.9237.4251.6266.7
Sulawesi Tengah187.6198.9210.8223.4236.8251.1
Sulawesi Tenggara199.3211.3223.9237.4251.6266.7
Sulawesi Utara175.9186.5197.6209.5222.1235.4
Gorontalo175.9186.5197.6209.5222.1235.4
Maluku Utara175.9186.5197.6209.5222.1235.4
Maluku175.9186.5197.6209.5222.1235.4
Papua228.6242.3256.9272.3288.6305.9
Papua Barat228.6242.3256.9272.3288.6305.9
Papua Barat Daya228.6242.3256.9272.3288.6305.9
Papua Pegunungan228.6242.3256.9272.3288.6305.9
Papua Selatan228.6242.3256.9272.3288.6305.9
Papua Tengah228.6242.3256.9272.3288.6305.9

Bauxite: 50% of the standard. Each year's figure already reflects the future value of money (government bond rate).

4. Download the calculation template

The exact table from the decree and the formula already wired in — type the hectares, pick the province and year, and the guarantee appears. It is a spreadsheet, not a box on a web page: you can change an assumption, check every cell, and attach it to a submission.

  • 36 provinces × 2025–2030 included
  • Automatic formula
  • Bauxite 50% factor
  • Ready to attach

5. What decides whether it is approved

The number is the easy part. The file is what gets rejected — usually for the same handful of reasons.

  • Clearing area does not match the map and the RKAB
  • Topsoil stockpile and nursery capacity not evidenced
  • Drainage and acid mine water plan missing from the drawing set
  • Five-year staging written as one lump, with no annual target
  • Bank guarantee placed late, or the deposit tenor does not match

Want to know where your own file stands? Run the free compliance clinic

Questions people actually ask

Apa itu Jaminan Reklamasi?

Dana yang wajib ditempatkan pemegang IUP/IUPK sebagai jaminan bahwa reklamasi lahan bekas tambang benar-benar dilaksanakan. Besarannya paling sedikit mengikuti standar biaya pada Lampiran II Kepmen ESDM 344.K/MB.01/MEM.B/2025.

Bagaimana rumus menghitung Jaminan Reklamasi?

Luas bukaan lahan yang direklamasi (hektar) × standar biaya provinsi pada tahun pelaksanaan reklamasi × faktor komoditas. Khusus bauksit, faktor komoditasnya 50%.

Berapa standar biaya reklamasi per hektar?

Berbeda per provinsi dan per tahun: 2025–2030. Contoh 2026: Aceh Rp 155,9 juta/ha, Kalimantan Timur Rp 162,7 juta/ha, Papua Rp 242,3 juta/ha. Tabel lengkap 36 provinsi ada di halaman ini.

Kapan jaminan harus ditempatkan?

Untuk periode 5 tahun pertama tahap Operasi Produksi, jaminan ditempatkan seluruhnya paling lambat 20 hari kerja sejak rencana reklamasi disetujui.

Apa bentuk penempatan jaminan?

Deposito berjangka pada bank pemerintah di Indonesia, dalam Rupiah atau Dolar Amerika Serikat.

Apakah angka di halaman ini nilai jaminan resmi?

Bukan. Ini hitungan awal yang bisa diperiksa. Nilai resmi ditetapkan dalam dokumen rencana reklamasi yang disetujui; halaman ini menyebut dasar hukum dan tanggal pembacaan datanya.